Skip to Navigation

Hydratight News Archive: 2018

3 October 2018

Global bolted joint integrity specialist Hydratight has introduced an equipment rental program which will allow US customers to lower costs of online bolt renewal operations by up to 40%.

Read the full article »
26 September 2018

Global machining specialist Hydratight has become the first company to use electrical discharge machining (EDM) for maintenance work on a live nuclear reactor pipeline system.

Read the full article »
9 May 2018

Integrity assurance specialist Hydratight has announced a three-year contract with a major North Sea operator to support flange management and end-to-end process services.

Read the full article »
14 March 2018

Global power generation bolting engineered solutions provider Hydratight has secured a contract to provide a newly designed Multi Stud Tensioning (MST) system through a collaborative agreement with local Japanese agents, Yokohama Engineering Services.

Read the full article »
15 January 2018

Joint integrity specialist Hydratight is offering the chance to book a free lunch and learn to hear about the company’s hot bolting services in 2018.

Read the full article »
4 January 2018

Joint integrity specialist Hydratight has strengthened its nuclear portfolio with new contracts across the Eastern USA.

Read the full article »
Syndicate content